Fieldside Commons

Case Study


Organization: Fieldside Partnership
Project: Fieldside Commons Corporate Office Campus
Location: Aberdeen, Maryland
Completion: 2011
Software Used: Autodesk® Revit® Structure, Tekla® Structures

 

Project Scope

Corporate office campus that will contain four separate four-story buildings. Each building has a brick, cast stone, and dryvit exterior and contains a central core area with lobby, stair tower, elevators, restrooms, and two additional stair towers on either side of the building. All four of the buildings were designed to meet LEED Silver certification.

Project Timeline

Phase one included one of the four buildings with a highly aggressive schedule that allowed only six weeks for design

Structural Features and Services

The building structures include steel frame building with steel joists and beams and concrete floor slabs. This project included integrated structural services where CEG was retained to complete structural engineering as well as full structural steel fabrication drawings to expedite the schedule and minimize coordination issues on the project.

Software Used

Autodesk® Revit® Structure was used for BIM design modeling and coordination; Tekla® Structures was used for fabrication drawing work.

Project Cost

$13,000,000

 